US 221 Widening Updated November 2017

In 2016-2025 STIP, R-2233BB is funded with ROW (property acquisition) starting in FY 2018 and construction slated for FY 2020. The BA section was funded in the 2018-2027 draft STIP. Currently, property acquisition is scheduled for FY 2022 and construction in FY 2025.